J. Ocean Eng. Technol. Search

CLOSE


J. Ocean Eng. Technol. 2009;23(4):25-31.    

A Numerical Prediction of Pollutant Material Budget during the Flood and Dry Season in Gwangyang Bay
Kim Jin-Hyuk,Lee In-Cheol,Yoon Han-Sam
Department of Ocean Engineering Pukyong National University,Department of Ocean Engineering Pukyong National University,Research Center for Ocean Industrial Development Pukyong National University
광양만의 홍수기 및 갈수기의 오염물질수지 예측
김진혁,이인철,윤한삼
부경대학교 해양공학과,부경대학교 해양공학과,부경대학교 해양산업개발연구소
© 2009 The Korean Society of Ocean Engineers     Open access / Under a Creative Commons License
Keywords: Pollutant material budget, Water quality, Hydrodynamic model, Flood season, Dry season, Gwangyang Bay
핵심용어: 오염물질수지, 수질, 해수유동모형, 홍수기, 갈수기, 광양만
Abstract
To predict pollutants during the flood and dry season in Gwangyang Bay, the net-fluxes and pollutant material budgets of COD, T-N, and T-P were calculated in Gwangyang Bay using a 2-D hydrodynamic model. Calculating the net-flux for each area in Gwangyang Bay showed that the net-fluxes in regions IV, V, and VII were increasing, but those of regions II, III, and VI were decreasing. In budget calculations for COD, T-N, and T-P in Gwangyang Bay, it was estimated that during the dry season the COD is approximately 1.6 times higher than during the flood season. The T-N during the flood season is approximately 7 times higher than during the dry season. However, the material budget for T-P in Gwangyang Bay predicted that it is almost nonexistent. Moreover, the central part of Gwangyang Bay (Region IV) has the highest material budget of overall pollutants.


ABOUT
BROWSE ARTICLES
ARTICLE CATEGORY

Browse all articles >

PUBLICATION ETHICS
FOR CONTRIBUTORS
Editorial Office
President Office BD Rm. 1302, 13 Jungang-daero 180beon-gil, Dong-gu, Busan 48821, Republic of Korea
Tel: +82-51-759-0656    Fax: +82-51-759-0656    E-mail: ksoehj@ksoe.or.kr                

Copyright © 2024 by The Korean Society of Ocean Engineers.

Developed in M2PI

Close layer
prev next